Code lookup · Iron & steel · chapter 72
7229 90 50 under UK CBAM
Wire of steel containing by weight 0.9% to 1.1% of carbon, 0.5% to 2% of chromium and, if present, less than or equal to 0.5% of molybdenum, in coils (excluding rolled bars and rods)
Heading 7229: Wire of other alloy steel — tariff line: Containing by weight 0,9 % or more but not more than 1,15 % of carbon, 0,5 % or more but not more than 2 % of chromium and, if present, not more than 0,5 % of molybdenum
Priced from
1 January 2027
HMRC publishes a default value for this code, so imports of it are charged from day one.
HMRC default value
4.153 tCO2e/t
Any origin, 1 January 2027 to 31 December 2028; includes a markup of 10% in every sector except fertiliser.
Indicative charge
£40.24 per tonne
At HMRC's illustrative iron and steel rate of £9.69 per tCO2e.
What that means on real volumes
| Imported in a year | Embodied emissions | Indicative CBAM |
|---|---|---|
| 25 tonnes | 104 tCO2e | £1,006 |
| 100 tonnes | 415 tCO2e | £4,024 |
| 500 tonnes | 2,077 tCO2e | £20,120 |
| 2,000 tonnes | 8,306 tCO2e | £80,480 |
This is the charge on default values. Verified emissions data from the installation that made the goods replaces the default line by line and usually lowers the bill; a return filed on defaults cannot be amended to actual data later. Goods from a country with a carbon price HMRC recognises may also get carbon price relief.
Importing 7229 90 50?
- Get a readiness position from four questions: threshold outlook, exposure band and a dated checklist. Free until 31 March 2027.
- Compare supplier quotes with CBAM added, before you buy.
- Price your whole customs export, line by line, with the working shown.
- Ask your supplier for emissions data with the free template.
Other priced codes under heading 7229
- 7229 20 00 Wire of silico-manganese steel, in coils (excluding bars and rods)£65.16 /t
- 7229 90 20 Wire of high-speed steel, in coils (excluding bars and rods)£56.01 /t
- 7229 90 90 Wire of alloy steel other than stainless, in coils (excluding rolled bars and rods, wire of high-speed steel or silico-manganese steel and articles of subheading 7229.90.50)£64.04 /t
Default value: HMRC Default Values notice, 16 October 2026 (draft until 1 January 2027). Rate: HMRC illustrative rates, 16 October 2026; official first-quarter rates due before 31 December 2026. Tariff description: UK Trade Tariff, Open Government Licence, as at 2026-11-14. Indicative, not tax advice.