Skip to content
CBAMReturn

Code lookup · Iron & steel · chapter 72

7229 20 00 under UK CBAM

Wire of silico-manganese steel, in coils (excluding bars and rods)

Heading 7229: Wire of other alloy steel — tariff line: Of silico-manganese steel

Priced from

1 January 2027

HMRC publishes a default value for this code, so imports of it are charged from day one.

HMRC default value

6.724 tCO2e/t

Any origin, 1 January 2027 to 31 December 2028; includes a markup of 10% in every sector except fertiliser.

Indicative charge

£65.16 per tonne

At HMRC's illustrative iron and steel rate of £9.69 per tCO2e.

What that means on real volumes

Imported in a yearEmbodied emissionsIndicative CBAM
25 tonnes168 tCO2e£1,629
100 tonnes672 tCO2e£6,516
500 tonnes3,362 tCO2e£32,580
2,000 tonnes13,448 tCO2e£130,320

This is the charge on default values. Verified emissions data from the installation that made the goods replaces the default line by line and usually lowers the bill; a return filed on defaults cannot be amended to actual data later. Goods from a country with a carbon price HMRC recognises may also get carbon price relief.

Importing 7229 20 00?

Other priced codes under heading 7229

  • 7229 90 20 Wire of high-speed steel, in coils (excluding bars and rods)£56.01 /t
  • 7229 90 50 Wire of steel containing by weight 0.9% to 1.1% of carbon, 0.5% to 2% of chromium and, if present, less than or equal to 0.5% of molybdenum, in coils (excluding rolled bars and rods)£40.24 /t
  • 7229 90 90 Wire of alloy steel other than stainless, in coils (excluding rolled bars and rods, wire of high-speed steel or silico-manganese steel and articles of subheading 7229.90.50)£64.04 /t

Default value: HMRC Default Values notice, 16 October 2026 (draft until 1 January 2027). Rate: HMRC illustrative rates, 16 October 2026; official first-quarter rates due before 31 December 2026. Tariff description: UK Trade Tariff, Open Government Licence, as at 2026-11-14. Indicative, not tax advice.